● Modular · Cost effective · Engineering-grade
Modular Buildings
& Prefab Camp Solutions
Featuring K-Type and T-Type design solution | Build up to 3 floors |Factory output 35,000 ㎡ per month.
Choose Your Building Type
Two engineering systems — K-type for cost efficiency at scale, T-type for heavy-duty and flexible projects.
K-type vs T-type Comparison
A quick side-by-side to help you decide which system fits your project requirements.
| K-type | T-type | |
|---|---|---|
| Frame material | Light steel, galvanized | SHS square hollow steel |
| Wind load | 80-100km/h | 80–150 km/h |
| Max floors | 3 floors | 3 floors |
| Size flexibility | K = 1.82m module | Fully custom |
| Cost | Lower cost | Competitive |
| Production output | 35,000 m²/month | 35,000m²/month |
| Best for | Large camps, schools, dormitories | Hospitals, high end camp, clinic, warehouse |
Modular Building Project Cases
Delivered to contractors, governments and developers across Asia, Africa and the Middle East.

K-type

K-type

K-type

T-type

T-type

T-type
Quality & Certifications
Third-party verified. Every modular building leaves our Foshan facility meeting international standards.
Frequently Asked Questions
A modular building is a prefabricated structure built from standardised structural units manufactured in a factory and assembled on site. Unlike container houses, modular buildings use a dedicated steel frame system (K-type light steel or T-type hollow section square steel) allowing 2-3-storey construction and good insulation and durability.
K-type uses a light steel frame based on a 1.82m modular size — cost-effective and ideal for large worker camps, schools and dormitories. T-type uses hollow section square steel frame with fully customisable dimensions, designed for high wind loads (80–150 km/h), hospitals, and projects needing precise structural specifications.
Both K-type and T-type can be stacked up to 3 floors with appropriate steel connectors, staircases and structural engineering calculations. Our team provides full stacking drawings and load calculations included in the project documentation package as per request.
Standard lead time is 20–25 days after design confirmation and deposit. Our modular house workshop facility produces 35,000 sqm of modular buildings per month, so large orders can be accommodated without delays. Shipping time varies by destination port and shipping line— Southeast Asia 5–15 days, Middle East 15-35 days, South America 40–60 days, Africa 20-60days.
Yes — both K-type and T-type are designed for disassembly and relocation. The bolt-connection system allows modules to be taken apart, transported and reassembled at a new site. This makes them cost-effective for projects that move between locations, such as mining and construction camps.
Tell Us Your Project
Our team will respond within 24 hours with a full project quotation — unit price, lead time and shipping cost included.
